Unikon Washing Systems
Request for Quote
RFQ Date
Quote Request Date
Customer Information
Customer
Contact Name
Address
E-mail
City
State
Phone #
Fax #
Same as Bill to
Phone #
City
Address
Customer
Zip
State
Fax #
Zip
Customer Ship to Information
Quotation Priority
Immediate Need
Active Project
Upcoming Project
Budgetary Only
(Purchase within 60 days)
(Purchase within 3-6 months)
(Purchase within 6 - 12 months)
(For future project)
Utilities Information
Power Available
Hot Water Available
Cold Water Available
Equipment Information
Electrical / Controls
PLC
Control Description
Agency Approval
AIB (American Institute Baking)
USDA/Dairy
CE
CSA
Other
*Please note that MSI equipment is designed and built following USDA standards. All on-site and governmental approvals will be the financial responsibility of the customer.
Additional Information
Product Information
Washer Required
Wash Water Heating By
Rinse Water Heating By
Blowing/Drying
Vapor Extraction
Dosage Pump
Control Panel Location
Preferred Temperature
Temperature Controls
Low Temperature Cut-off
Additional Options
Product #1
Product Dimen.
L
Product Dimen.
Product #2
Product #3
Product Dimen.
Pollution 1
Light
Med
Heavy
Heavy
Med
Light
Pollution 2
Heavy
Med
Light
Pollution 3
Product 1 Rate
Product/Hr
Product/Hr
Product 2 Rate
Product 3 Rate
Product/Hr
Blower
Dryer
Drying Results (blow drying)
None
Wash
Rinse
Both
Right
Left
Front
Wash Cycle
Deg. F/C
Rinse Cycle
Deg. F/C
Manual
Digital
On Tank
On After Rinse
Pre-Wash
Rotating Filter
One-Man Operation
Wash Basket
Easy Adjustable Side Guides
Un-stacker/Stacker
Transport Stop Photo-Eye
UHMW Product Guides
Horizontal/Vertical Rotating Brushes
Control Panel Cover (Clear)
VFD
*Required Fields
Date Issued: 10/10/08 Supersedes: 10/18/07
Unikon (Rev 5) QSF 7.2-1.2.1.22
Country
Province
Province
Country
Address
F
C
C
F
W
H
H
W
L
H
W
L
Customer Specs
Yes
No
Per
Type name here
*
*
*
*
*
*
*
*
*
*